12 in 1 Industrial Strength Epoxy Paint with Anti Skid Quartz Sand for Factory Showroom Floor Waterproof Chemical Resistant Cat Epoxy Lantai Heavy Duty 1/3/5LL

🏆 12-in-1 Epoxy Colored Sand Floor Paint - Professional Flooring Solution🚀 Malaysia Ready Stock · Ships within 24 Hours · Next-Day Delivery Available📦 Product Specifications【Product Name】12-in-1 Professional Epoxy Colored Sand Floor PaintWhy "12-in-1"? - One product, 12 major advantages: Waterproof · Anti-slip · Crack-resistant · Hardness 8H+ · Quick-drying · Wear-resistant · Chemically resistant · UV resistant · Self-leveling · Easy to clean · Environmentally friendly · DurablePackaging and Shipping:• Small Bucket: 1 kg (shipped in 1 kg units)• Large Bucket: 5 kg (5 kg per container)Note: Orders are shipped in increments of 1 kg or 5 kg. 5 kg orders are packaged in large buckets; other quantities are packaged in small buckets.【Color Selection - Currently Available in 5 Stunning Colors】🔸 Standard Series (Base Sand):✓ Gray ✓ Light Gray ✓ Phthalocyanine Blue ✓ Green ✓ Milky White【Suitable Environment】Suitable for most indoor and outdoor environments, including high-pressure environments such as factories.【Coverage Area】1 kg covers approximately 1 square meter (≈10 square feet)【Application Method】Professional smoothing + advanced self-leveling technology【Shelf Life】Waterproof and sealed storage, can be stored for up to 12 months🔧 Complete Usage GuideStep 1: Surface PreparationThorough Cleaning: Remove all dust, grease, oil stains, and loose particles from the substrate.Primer: Apply the primer evenly using a roller (Note: No primer is needed for tile and marble floors).Drying: Wait for the primer to dry completely before proceeding to the next step.Step 2: ApplicationMix Thoroughly: Pour components A and B into the mixture and stir thoroughly for 3-5 minutes.Self-leveling: Pour the mixed product onto the floor and allow it to level naturally.Even application: Use a scraper to evenly apply the product in the direction of application.Defoaming: Use a peg roller to remove air bubbles.Drying time: Initial drying 4-10 hours, light use 24 hours, complete curing 48 hours.Step 3: Final finishing• Use a defoaming roller to apply in crisscrossing directions to ensure a perfect, bubble-free surface.• Only allow for heavy use or water contact after complete curing.⚠️ Important NotesMixing is crucial: Use a mixer to thoroughly mix materials A and B.Working time limit: Complete plastering within 15-20 minutes - to avoid material hardening and causing application problems.Curing time:✅ 24 hours: Safe for light foot traffic and water contact.✅ 72 hours: Completely cured. Capable of withstanding the crushing force of forklifts and heavy machinery weighing over 5 tons.📞 Comprehensive Customer Support:• Quality Guarantee: 1-month quality guarantee from the date of purchase• Quick response within 24 hours (working days)

lafireflyzekids

lafireflyzekids

Seller ratings 97%

Review

Oops
This video has no reviews.